Fridge Cavity Framing, Kealba
The existing fridge cavity was removed and the wall opened up to suit a larger, new fridge. As parts of the wall carried roof loads, LVL was used in sections to maintain the structure and transfer loads down into the foundation. A new frame was then built for the fridge insert and overhead cabinetry, ready for a clean, built-in finish.
